19 0 obj
<>
endobj
Home. This work Type is subdivided into four categories: Traffic Operations Design. Term. This type of work includes surveys and the preparation of maps using photogrammetric methods. |5U=lI7W}.(yp>pNy!#0-v:1x
{Z:N_nZZR~LlVK! Planning in this sub-category usually occurs at levels where difficult trade-offs in the use and allocation of resources must be made and where many people will be affected in important but often subtle ways. This type of work includes CEI for the construction, rehabilitation, widening, or lengthening of steel superstructures of the structure types listed in Type of Work 10.6. Included in this subcategory are activities involving the systematic analysis of future demand for transportation facilities and services, leading to recommendations for addressing that demand. This type of work includes inspection and load rating of all complex bridges except movable bridges. Included in this sub-category are development and refinement of statewide transportation plans or plan components, and activities involving the determination of the impacts and implications of policies, legislative issues, processes, and standards on a wide variety of subjects, including: transportation facilities and services; land use; the environment; the private sector; and the public. The new document will be posted once the update is complete. Although recommendations as to the type, number, and approximate location of transportation facilities are to be made, this sub-category does not include determination of the precise location or design of facilities or systems. +M`N/s?6K]Yl]5;-#Lg5$}\%%5ha%GPywSE'qI %WKsvxf25z=0+Zgu]G`J8_WG[:t#}OP
Uo'zs-Emna*6Y*WJz6WoEwT423j62\~yLQNxlY~*+SU5ltB@:6-(bi'#{+bvc/ INRMP Finding of No Significant Impact (FONSI) INRMP Final Environmental Assesment. Search. 2VP%/@c~K*ZWPc NSA Annapolis Seawall FONSI j]q]UFrvC#68[`nkWz
=!3.G#q48TD7wVD`K\ypQSovoZ>A+|^\9gD$qb- /9eQ(#c/28qL UPk =UwcV=az x!*E^?C|U2L {^(_1\dm#6+r1ak);&kQ
bAd/KKd~,f. Runoff from rain and snow flows into two seasonal ponds. Generally, this group of structures is limited to conventional foundation types, simple geometry, and having total estimated bridge(s) plan area(s) no greater than 100,000 square feet (sum of the areas of multiple bridges). Log in. This type of work is defined as the use of electrical engineering, electronics engineering, computer science, and traffic engineering to analyze, design, and implement real-time intelligent transportation systems. The spring is no longer a reliable source of water due to nearby wells that have been drilled for irrigation. Projects of this type generally include utility relocation plans, drainage design and permitting, maintenance of traffic plans, traffic engineering applications, intersection details, etc. 2021 DOT INTEL - All Rights Reserved | 13799 Park Blvd, Ste 266 | Seminole FL 33776 | (872) 44-INTEL, FDOT Project Numbers: FM and FPID Numbers Demystified. This group includes the following sub-categories of qualification: This type of work involves transportation and transportation related planning activities in the broadest or most general way. The part apportioned to the Department of Interior ended up in the hands of the state government. FDOT's DBE goal for 2021-2023 is 10.65%. This type of work includes roadway design for all urban highways with new curb and gutter and new or major reconstruction rural projects with substantial capacity improvements such as adding two or more lanes. The cross section shows a Type B 12.5 Base instead of the Optional Base Group 9. auW@y3i?'Te]!g]YES+"(zfSCv2ta V.o`JCSEQz]
)' A lawsuit was filed against Boeing-Agri Industrial Company in relation to how the company was pulling water out of the Willow Creek arm of the reservoir behind John Day Dam. This type of work requires the consultant to make specific recommendations to improve the operational efficiency at a particular location. The range was established by the U.S. Army Air Force in 1941 as the Arlington Bombing Range, being originally named after Arlington to the west. 0
The Naval Weapons Systems Training Facility Boardman, informally known as the Boardman Bombing Range, is a military installation south of Boardman, Oregon in the United States.It is used by NAS Whidbey Island as their principal training grounds for testing EA-18G Growler aircraft and for drone testing. The remainder of the land is split in two portions, the first being jointly owned by the State of Oregon, Portland General Electric and Morrow County. It is also a seasonal nesting area for long-billed curlew. Materials to be tested include aggregates; concrete products; cements and additives, including water, epoxies, and curing compounds; bituminous materials, mixtures, additives, and joint fillers; metals; galvanizing, rubber, paints, and other coatings; and soils and limerock. %%EOF
Additionally, the work entails the detailed study and preparation of environmental reports and documents which evaluate the physical, natural, social, cultural, economic, and human impacts of the alternatives under consideration upon the adjacent community. C@ &r$Vq"u?/ e"30 ` $
9/2/2021: 9:00 AM: FDOT Concrete Rehab Topics: Daniel Lauricello and Claudia Coll: Presentation: 9/9/2021: 9:00 AM: Products in Projects- From Design to Deficiency: Karen Byram: Presentation: 9/14/2021: 9:00 AM: Shear Strengthening of Sunshine Skyway Bridge Trestle Spans Beams with CFRP: Atiq Alvi, Jim Jacobsen: Nb xZYs8~w!.S)oH[x1dR!qyv7DZqY!_wFA7Og? This type of work includes CEI of structures that cannot be included in Type of Work 10.4 because of deck area, complex geometry (curvature, skew, or variable width), complex design (including bridges with statically indeterminate superstructure components) with spans estimated to be less than 400 feet, non-conventional substructures, bridges over navigable waters, and railroad bridges. <>
3. 4. [12] They also maintain a remote antenna range on the leased property that conducts tests for national security purposes. This work group involves the study and evaluation of the social, economic, and environmental effects on the human and natural environment by transportation systems and alternate transportation modes in meeting identified community transportation and growth needs. 3 0 obj
MDG's Prequalified Status. 1130 0 obj
<>/Filter/FlateDecode/ID[<03EDD986C2B7704AB95970D1052AEFF4><022A633383D0EB4E85E561ED5EE149CA>]/Index[1117 20]/Info 1116 0 R/Length 74/Prev 53663/Root 1118 0 R/Size 1137/Type/XRef/W[1 2 1]>>stream
This group includes the following sub-categories of qualification: This type of work is defined as the study of operational problems and the determination of traffic operational improvements for efficiency and safety. This work group involves the study and evaluation of the social, economic, and environmental effects on the human and natural environment by transportation systems and alternate transportation modes in meeting identified community transportation and growth needs. 25 0 obj <>
endobj
Public involvement and interagency coordination are integral parts of the assessment process. 2. Optional Base (See Specification 285) RESURFACING EXISTING DRIVEWAY DRIVEWAY APRON (SY) AREAS FOR ONE 5' DEEP MATERIAL TYPES AND THICKNESSES FOR PAVED CONNECTIONS Materials Minimum Thickness (in.)
Review and analysis of professional engineering issues contained in statements of qualification and technical proposals submitted by consultants competing for professional contracts. This group includes design for the construction, rehabilitation, widening, or lengthening of structurally-continuous steel superstructures (steel box girders, curved steel girder bridges, etc.). Included in this sub-category are activities involving site analysis for compliance with comprehensive plans, local ordinances, and appraisers cost to cure; reviewing and providing engineering opinions of site plans for feasibility and conformance with applicable codes and regulations; assessing the impact to drainage and environment; and preparing site plan and studies which may encompass parking layout, vehicle use areas, and general site consideration in conformance with applicable codes, laws, and regulations. This type of work includes boundary surveys, right of way surveys, as-built surveys, construction layout surveys, topographic surveys, hydrographic surveys, quantity surveys, record surveys, mean high water line surveys, and special purpose surveys. Notify the Engineer in writing of the base option selected for each typical cross-section at least 45 calendar days prior to beginning placement of base material. trailer
This type of work deals with planning for entire systems or portions of systems (one or several modes) of transportation covering a smaller geographic area than Systems Planning or for a specific transportation corridor. 43 0 obj
<>stream
The new building has offices for and can house six individuals. The cemetery is one of the largest known pioneer cemeteries on the trail. endstream
endobj
32 0 obj
<>stream
<]>>
<>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
Access to the area for observation and experimentation is administered by the Officer in Charge, and those wishing to gain access must provide a written report of the purpose of their visit prior to gaining entry. Advisory services, including personal interviews and coordination with displaced persons, must be provided to ensure the timely relocation to replacement properties. This order was the first of its kind since 1990.[4]. xZI7cb``@4/_$Ypr*
zYYY||jXE2?k`k{F+zoNwF;xkn~]^ov[etm6]ukmw;a{skPCB6{a(h^QpB=gwr^0L{`2qJ6 &g";K=1tSj,~h.W4=AO1ar$b*9!r^\?.J5&bdyO5hf). The portion of Bombing Range Road adjacent to the installation is owned by the Navy but is open to the public. The cross section shows a Type B 12.5 Base instead of the Optional Base Group 9. or the department prefer one of the two options in particular? 0000120474 00000 n
Sign up. ie"/ts5T B/v1fk<5t5,mZ`nx (The INRMP is currently being updated. Engineering analysis of transportation facility deficiencies; and the preparation of an engineering scope of services and staff hour estimate to correct those deficiencies. District 04 Proposal Details T4580 Proposal ID: T4580 Project #: 43992915201 Project Description: SR-25/US-27 FROM MP 12.599 TO SOUTH OF SOUTH BAY MP 25.854 - SAFETY PROJECT Letting Date: 5/26/2021 Bid Letting Location: CENTRAL OFFICE Showing items 1-9 of 9 Print Questions and Answers The new base materials shall be either of the same type and composition as the materials removed or of accordance with current FDOT asphalt mix specifications. `` The state has leased its portion of the land to Boeing, which uses it for antenna testing, while the Navy has continued to use their portion for weapons testing. b`3.Pn0UpA%T! Negotiations between the state government and the Navy gave the range the boundaries it has today. This includes system performance and cost analysis, system hardware and software design, development of management plans, system installation and operation, system testing and debugging, system documentation, and the training of operations personnel. 0
MDG is currently considered a prequalified consultant in the following work groups: 3.1 - Minor Highway Design. Typical activities include: data collection and analysis, including analysis of transportation/land use relationships; estimation, forecasting, and assignment of travel demand, including modeling the characteristics and use of transportation systems; mode split and multimodal tradeoff analysis; development of ITS strategies; impact analysis; evaluation and decision making; cost analysis and financial feasibility; and modal coordination and management. 0000061577 00000 n
|o}3B{JD#uA]'Z,G[~6@e5oWNmDdE9pJH=5
-Jg#wAGBQ4&O!sFz8zq9g1v! 522-001, Index No. On this Wikipedia the language links are at the top of the page across from the article title. This type of work is defined as relocation planning at the conceptual stage of a transportation project and the preparation of the Relocation Needs Assessment Survey, identifying displaced persons and likely business damage candidates pursuant to the Uniform Relocation Assistance and Real Property Acquisition Policies Act and 49 C.F.R., Part 24, incorporated herein by reference, and available at: http://www.fhwa.dot.gov/realestate/ua/index.htm. Transportation Symposium 2022. 4 0 obj
%%EOF
This group includes the following subcategories of qualification: a. Sand dunes can be found in section C of the natural area and vegetation is classified as sagebrush steppe. Typical activities, usually performed at a more detailed level than with systems planning, include data collection and analysis, as well as: analysis of transportation/land use relationships; estimation, forecasting, and assignment of travel demand, including modeling the characteristics and use of transportation systems; mode split and multimodal tradeoff analysis; development of ITS strategies to maximize the operation of the corridor; impact analysis; evaluation and decision making; cost analysis; and financial feasibility; and modal coordination and management. 5={tdX~ `cFC/
#yxQsi@n?$4CTcTf&}qcQhFGwKXj& V V4=^f^7Al'@UvD3W`8*LyK:B/Eq-}G{nJA<3,eqV^ |MVIG{icZ^tbF[;K4|t=ihl_+6'^+rzYBzL
Y[p Past Webinars Certificates. This type of work is defined as the preparation of business damage estimate reports describing the impact of a right of way acquisition on the income, expenses, and profits of a particular business, in accordance with the standards established in Rule Chapter 14-102, F.A.C., and all other recognized accounting and performance standards; and the critical and analytical review and evaluation of business damage estimate reports, exhibits, and other documentation submitted to the Department by the business damage estimator on behalf of the Department or business owners. xb```>&NiAd`0p4pL3@"WowS^ @:H200:iNe@A$: M4#0 `
They also propose constructing new air-to-ground weapons systems. The work involves preparing engineering studies to address economic and engineering feasibility of alternatives, level of service, traffic capacity, geometrics, soils, structures, intersection and interchange improvements, etc., to accommodate travel demand at an acceptable level of service. 2 0 obj
Many of the traffic engineering studies require knowledge and experience with traffic engineering computer programs such as SOAP, PASSER, and TRANSYT. Completed Final NSA Annapolis INRMP_May 2011, (The INRMP is currently being updated. Potential mitigations that are identified in the studies and public involvement are evaluated and incorporated into the alternatives as appropriate. Projects of this type generally include the use of complex geometrics, substantial drainage evaluation and design features, permitting, traffic engineering applications, utility relocation plans, maintenance of traffic plans, interchange design, etc. Index No. The methodology involved includes testing moisture content, grain size, Atterberg limits, compaction, and Limerock Bearing Ratio (LBR) tests. 9.4.1: Standard Foundation Studies and, in addition, the complex geotechnical analyses required for the design and construction of non-redundant drilled shaft bridge foundations. Soils in the area were deposited by the Missoula floods during the last ice age. These were created to support ranching that happened before the military took over. 4 0 obj
%%EOF
34 0 obj
<>/Filter/FlateDecode/ID[<4E9C541A9D85154189AACC8991834A58><011EA14CD026024EA6342123C76308DF>]/Index[19 25]/Info 18 0 R/Length 89/Prev 330441/Root 20 0 R/Size 44/Type/XRef/W[1 3 1]>>stream
ASPHALT BASE ASPHALT BASE SPECIAL SELECT SOIL BASE SPECIAL SELECT SOIL BASE 5. Completed Final NSA Annapolis INRMP_May 2011. [8], A significant portion of the original range was transferred outside of the military to both government and private entities. . The methodology involved includes on-site investigations by performing borings, Standard Penetration tests, Cone Penetration tests, and rock coring; the use of specialized test equipment, such as the field vane, pressuremeter, or dilatometer; and the use of geophysical methods. Boeing had originally intended to turn the area into a space park, but later decided to use the land for farming instead and in 1974 created the Boeing-Agri Industrial Company as a wholly owned subsidiary. Highway Design Bridges. Flashcards. The area has low vegetation, such as sagebrush and gradually climbs from near the Columbia River in the north to hills in the south which reach an elevation of 870 feet (270m) above sea level. [9], Seven miles of the Well Springs Segment of the Oregon Trail is located within the boundaries of the installation and is listed on the National Register of Historic Places. Install the filter fabric in accordance with Specification 514. 56 0 obj
<>
endobj
}n$3^Lv@E2@EO;;VJi#8=nL:j/QGLKIgx]8+.2q&vXs a[&Iif|taD1Pk3^dMCQU/"hYF.'Z:SHB{UvtS)GE!_tO]WP7?p6AfPxLH^B? vuBV;} LQ1=b-ej~+Dk =osI6-iyu!55UfcQWwcd8AAE`t.`/e2p,jAB0 LjJ(=QfG$@| ty47AO These include a machine gun range, digital range, convoy live fire range, and a demolition range. 7@ENN,I
h9u.x6 H1 uW k1&,f
2CKGzo"v(rl>TeAKQ$(+"H$&cYUB{rz
7/5@5a=EX"S7a]3JUTK;4
Cy2+FOTP"Z4Y*CmZkNX@%{LqRjSp*X ]vG4=&h :jub7z6=F]xU6X4}w't(j?=cOM-{mK\, This type of work also involves the construction, replacement, or repair of traffic monitoring equipment including sensors (either installed in, or along the roadway) and associated equipment and appurtenances. [3] There are no year-round water bodies on the site. The land was marked as excess by the Air Force on August 11, 1960.[5]. [5] In 2015, the Navy constructed a new office building to replace aged structures on the property that were being used for that purpose. Such work involves lighting calculations, pole location, foundation design, electrical circuit calculations, and power supply and distribution design, and requires a basic knowledge of traffic engineering studies. Typically, this includes design for the construction, rehabilitation, widening, or lengthening of bascule bridges, swing bridges, and vertical lift bridges. This type of work includes the administration and inspection of single or multiple construction contracts on rural, municipal, urban, and interstate facilities; including necessary minor bridges as defined in Type of Work 3.1. hr}Bu
z Y^Em:\D2w:*h}4:. Published: 1/13/2021 4:12:36 PM Answers Note: [3] Beyond its primary operator at NAS Whidbey Island, the installation is also used by Oregon National Guard units based in Pendleton and Klamath Falls. The work effort may involve planning both short range (up to 10 years) and long range (more than 10 years) time periods, and may involve any or all typical activities of planning, including development and refinement of processes and procedures; development and analysis of policies, goals, and objectives; data collection and analysis; issue analysis; development and use of forecasting and other models; analysis of transportation/land use relationships; assessing the impact that planning transportation improvements may have on private property; establishment of standards and performance criteria; forecasts of transportation and transportation related data; determination and analysis of alternatives; multimodal/intermodal tradeoff analysis; analysis of alternatives; multimodal/intermodal tradeoff analysis; development of recommended plans and courses of action; financial feasibility; assessment of the impacts of growth management requirements on transportation; and public participation and coordination with other planning processes and plans. It includes street and signal inventories; intersection and crossing diagrams; highway lighting information at nighttime high accident locations; and analysis of accident reports, traffic counts, travel times, parking practices, and laws and ordinances affecting transportation. Following the war, the Army marked the land as surplus. July 19, 2021 Randy Weng FDOT Fort Myers Operations Center 2981 NE Pine Island Road Cape Coral, Florida 33909 RE: US41 Picayune Strand .
Later that year, the Obama administration ordered the company to divest the acquisition after it determined that there was "credible evidence" that the company would use this to hurt national security. Published: 7/21/2021 9:17:59 AM Availability of required equipment will also be considered, along with level of experience in evaluating qualification. plans, bid and use as optional base. %PDF-1.7
%
endstream
endobj
20 0 obj
<>
endobj
21 0 obj
<>/Font<>/ProcSet[/PDF/Text]>>/Rotate 0/Type/Page>>
endobj
22 0 obj
<>stream
%PDF-1.7
%
Also included is the field classification of materials and acquisition of soil and rock samples. This work group includes surveying and mapping, as defined in Rule Chapter 61G17-6, F.A.C., required for the land acquisition, design, and construction of transportation projects. Fdot district three covers the northwest florida region including the following 16 counties: Please do not send cash. hbbd```b``"A$#< #
Its location in eastern Oregon makes it drier than areas to the west of the mountain range. 18455 NE . Plants found include Russian thistle, snakeweed, and needle-and-thread grass. This type of work includes the CEI of structures that cannot be included in Type of Work 10.5.1 or 10.5.2 because of unique, specialized, or uncommon types of designs. This group includes the following sub-categories of qualification: This type of work is subdivided into two categories. The work includes all structural, electrical, and mechanical requirements. 0000000016 00000 n
This type of work includes data collection, intersection analysis and documentation, section analysis and documentation, timing implementation and fine tuning, and timing evaluation. Web as of january 1, 2023, the florida department of transportation's customer service portal has been updated. 2. Sheet 5 states "(OPTIONAL BASE GROUP 9, 10" LIMEROCK, LBR 100, MAY BE SUBSTITUTED UTILIZING BLACK BASE OVERBUILD)", please change to optional j>}D_vUoR:#S0 nNI4rS>sdSl#TMw0MoY9Quq56q+X6hC|(^%x,\6sT;{vQM8`2.a}am\{c+=GB?n\PJV?8. The installation of remote cameras would aid in training by providing visual information to determine the accuracy of weapons tests. Design Notes on SQ-17 and SQ-18 indicates asphalt to be final surface. The War Department established the Arlington Bombing Range by acquiring 95,986 acres (388.44km2) of land between 1941 and 1943. This area is not currently bombed during practice runs, but was a handful of times during World War II. [@|L0A+
@+b@5b@y4J5hkz:u13.REm82*E=H4~IC3S4= g:mz&P\.=3.2{&P=@UI([X4{o&PJC&P1?VYNmN8&quZp,? Bm^Q0iEeOP:/HK_\>:c`w4'vFD;qAO;8,gTZJ{`
{p*G0^0}. Such work also includes the evaluation of alternate transportation corridors, and location/design alternatives within viable corridors. <>/ExtGState<>/XObject<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/Annots[ 9 0 R] /MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
xko6{ }9[te+r\cphacolGPHw%Qr87go>.~88z|]\/_w],f7p8>=)~{Q/QX8>{q)?`QUBu)Em'wmq:,Ug~{~18x6\&EpY(&r"'zR}Mr8L jZ,?~w{xq+%M This type of work includes the CEI of bascule bridges and other movable bridges. 2021. Conduct Scope of Service meetings with professional consultants. 3. Although recommendations as to the type, number, and approximate location of transportation facilities are to be made, this sub-category does not include determination of the precise location or design of facilities or systems. H#ydT.xp;1Jz dKG? This type of work deals with planning for entire systems (one or several modes) of transportation covering an entire geographic area such as the development of long range transportation plans for an MPO, county, or region; or the development of an ITS Strategic Plan for a region. 0000091425 00000 n
<>/Metadata 76 0 R/ViewerPreferences 77 0 R>>
HWWL>~!.7#Y=$@(2/F[p>|2;U[1[i]%x Typically, this includes design for the construction, rehabilitation, widening, or lengthening of box culverts, retaining walls, cast-in-place or precast prestressed short span slab type bridges, simple span prestressed concrete beam bridges, and simple span I-beam bridges. 0000177084 00000 n
This group includes design for the construction, rehabilitation, widening, or lengthening of precast or cast-inplace concrete segmental superstructures or substructures. Past Webinars . It is located about 70 miles (110 km) south of the Yakima Training Center, which is used by . The State of Oregon owns the largest portion of the former range, which it leased to The Boeing Company. A comprehensive list of the fdot work groups for engineering consultants pursuing fdot professional services projects. The checkerboard fashion of how the Air Force distributed the land didn't work well for use as a bombing range, so the Navy entered negotiations with the state. "DeTxdqPI\G^CNeW9 3u3xj
$04AWByj@?cvTl.a f0WZJ40nT",v%={nXhw?"
5$0C
4fhi"!PQq{>; It was during these early years that the Boardman Airport, then known as the Boardman Flight Strip, was constructed. 2019. The construction of traffic monitoring sites may include design, preparing construction plans, writing specifications, and construction engineering supervision. [5], The gate for the range is located off of Bombing Range Road, which connects Interstate 84 at its junction with US 730 to Oregon State Route 207 on the south side of the range. endstream
endobj
26 0 obj<>
endobj
27 0 obj<>/ProcSet[/PDF/Text]>>/Type/Page>>
endobj
28 0 obj<>stream
314;@0KUfTB?6n2 @QihXV:Md{1trv!H"fMJJ,9yHvdT*1bGP.u2 #(IWTOmMF?S{zs=uGOLy|@?0IX"`Usgk2G-f Qz0W;C| eE8c?Q)FG\q9Ez=Bgs`L0U
KK[7o\q26.#]DP]fA5h5PS7/&T MPhIG0zAr1NVj\J/p$JtMCG 1]6
n3JkBMGKgp| TiA@#^6Hk61MCK{i`2K{$Gz
c%}T8@`xdPC-rU
%a^:^fW0N8q=AD
eiGP G N4p ?2#5[di?y WmVlUofCOUB^;VlQZS=NT;zi"..AcZ
(UX FDOT Work Group 2.0 2.0 Project Development and Environmental (PD&E) Studies. [13][14] In 2014, PGE built a new combined cycle natural gas power plant, named Carty Generating Station, next to the coal plant to replace it.[15][16]. Bridge Inspection. It is used by NAS Whidbey Island as their principal training grounds for testing EA-18G Growler aircraft and for drone testing. Several bird species, such as golden eagles, are year-round residents and small mammals like the long-tailed weasel and coyotes live within the ecosystem. endstream
endobj
startxref
VbpSc.\t(0&(z"A3.S\k0_ p_)Q{|J0T0trvmnsw{]/(Ilei5Wg\{9QtTkIH4G{'HpJBK9-m3h^+fOpyh 1ZM/f^Q 8ksww:)=gf+ea55HIXC]x[$PFgeOA,HIgA!y[28$Tg[Tl\r,>,rgT 285-2 for optional base materials, thickness and additional restrictions. This type of work includes conducting tests on soil and rock according to Department approved specifications for the purpose of classifying materials. Table 285-1: Optional Base Groups 1 through 7 Base Materials Base Group (Base Group Pay Item) 1 (701) 2 (702) 3 In situations where the designer requires the use of a single base option, as shown in the 1. This type of work is defined as the rendering of services in connection with the design and construction of a structure or group of structures which have as their principal purpose human habitation or use, and the utilization of space within and surrounding such structures. Typically reserved for rural road work, but sometimes includes interstate resurfacing (replacing the top layer of asphalt). This routing through the range would avoid cutting through farmland.[17]. 43 0 obj
<>stream
hbbd```b``"$XDND I KAjO 37 0 obj<>stream
This type of work includes CEI for the construction, rehabilitation, widening, or lengthening of structurally-continuous steel superstructures (steel box girders, curved steel girder bridges, etc.). This type of work includes the design of structures that cannot be included in Type of Work 4.1 because of deck area, complex geometry (curvature, skew, or variable width), complexity of design (including bridges with statically indeterminate superstructure components) with spans estimated to be less than 400 feet, non-conventional substructures, substructures requiring ship impact design, bridges over navigable waters, and railroad bridges.
Arthur Davidson Car Accident,
What Disease Does Michael Keaton Have,
Police Incident In Farnborough Today,
Articles F